Contact Us
- Cell/WhatsApp: +86-135-2669-2320
- Phone: +86-371-56771821
- E-mail: market@doingmachinery.com
News
-
DOING News
-
Industry News
Product
Project Case
-
50TPD fully automatic continuous pyrolysis machine project in the USA running smoothly
-
1TPD Waste Oil to Diesel Refinery Machine Operation Site in Thailand
-
Transforming Paper Mill Plastic Waste into Diesel Plant Installed in Mexico
-
DOING Waste tyre to diesel recycling plants were successfully installed in Japan
-
Waste tire to diesel recycling plant was put into operation in South Africa
-
14MTPD Capacity of Waste oil recycling refinery plant project in Ghana
-
Continuous rubber tyre pyrolysis machine installed in Liaoning,China
-
50TPD fully continuous waste tyre pyrolysis plant installed in Russia
12T plastic pyrolysis plant was loaded for delivery to France
2020-09-12 / DOING News / Leave Message / Chat Online
In early September 2020, one set 12T plastic pyrolysis plant was sent to France from the DOING factory. The following is the client's project schedule.
Time | Project Schedule |
In early 2019 | Understand the project, determine the daily plastic waste, and the daily handling capacity |
At the end of 2019 | Visit the DOING factory |
In early 2020 | Plan to start purchasing plastic pyrolysis plant |
March 2020 | Due to the epidemic, can't come to China |
From March to June 2020 | Provide drawings, schemes, project introduction, emission parameter documents and on-line communication of plastic pyrolysis plant scheme contract terms |
In July 2020 | Sign the contract |
In August 2020 | Plastic pyrolysis plant manufacturing |
Early September 2020 | Completion of plastic pyrolysis plant delivery |
Below is the picture of delivery.
Plastic pyrolysis plant was ready to delivery at DOING factory
Plastic pyrolysis plant at Qingdao port
If you are interested in the plastic pyrolysis plant, please contact us for a free quotation.
Leave A Message
Please feel free to leave your contacts here and your privacy is protected. A competitive quotation will be provided according to your detailed requirement within one business day.