Contact Us
- Cell/WhatsApp: +86-135-2669-2320
- Phone: +86-371-56771821
- E-mail: market@doingmachinery.com
FAQ
-
Continuous Pyrolysis plant
-
Oil Refining Machine
-
Auxiliary Equipment
Product
Project Case
-
1TPD Waste Oil to Diesel Refinery Machine Operation Site in Thailand
-
Transforming Paper Mill Plastic Waste into Diesel Plant Installed in Mexico
-
DOING Waste tyre to diesel recycling plants were successfully installed in Japan
-
Waste tire to diesel recycling plant was put into operation in South Africa
-
14MTPD Capacity of Waste oil recycling refinery plant project in Ghana
-
Continuous rubber tyre pyrolysis machine installed in Liaoning,China
-
50TPD fully continuous waste tyre pyrolysis plant installed in Russia
-
50TPD continuous waste rubber tire pyrolysis machine put into operation in India!
What benefits we can get from waste tyre recycling machine?
2014-03-14 / Continuous Pyrolysis plant / Leave Message / Chat Online
But, what benefits we can get from recycling waste tyres?
First, we can get fuel oil, carbon black and steel wire by pyrolysis. In Mexico, our customer told us, fuel oil price is about 650usd per ton. And also diesel oil has a nice price about 800usd per ton. Let’s see a profit analysis from DOING Macedonia client:
Profit analysis from Macedonia cutomer(10 tons capatity) | ||
Cost for one batch | ||
NO. | Item | Cost of each batch |
1 | 10 tons of waste tire | 10T*USD 42.5/t=USD 425 |
2 | 0.4 tons of coal | 0.4T*USD 70/t=USD 28 |
3 | Electricty and water | 244 kwh*USD0.26=USD 63.44 |
4 | Workers | 4*USD 15=USD 60 |
5 | Total cost | USD 576.44 |
Income for one batch | ||
1 | Crude oil | 4.5T*USD960=USD 4320 |
2 | Steel wire | 10T*15%*USD350/T=USD 525 |
3 | Carbon black | 3T*USD 20/T=USD 60 |
Total income | USD 4905 | |
Profit | ||
1 | Daily profit | USD 4328.56 |
2 | Month profit | 4328.56*25 days=USD 108214 |
3 | Annual profit | USD 108214*10 months=USD 1082140 |
Leave A Message
Please feel free to leave your contacts here and your privacy is protected. A competitive quotation will be provided according to your detailed requirement within one business day.